Find Hoist With Electric Monorail Trolley, 1 Ton Electric Chain Hoist, Chain Hoist Electric Chain on Industry Directory, Reliable Manufacturer/Supplier/Factory from China.

Inquiry Basket (0)
Home > Products > Electric Powered Hoists > Electric Chain Hoist > Electric Chain Hoist with Electric Monorail Trolley

Electric Chain Hoist with Electric Monorail Trolley

Basic Info

Model No.: LT-HE001

Product Description


1 ton electric electric hoist CD type

Technical specifications

1t electric hoist electric hoist
Lifting weight (t) 1

Standard lifting height (m) 8

Lifting speed (m / min) 8/3

Increase motor power (kw) 1.5

Speed (r / min) 1440

Voltage (V) 200-660

Frequency (Hz) 50/60

Main motor power (kw) 1.5

Speed (r / min) 1440

Operating speed (m / min) 12

Test load (t) 1.25

Weight (kg) 61


Details Chian Hoist



HOIST WORK SHOP


TEST&PACKING

Electric hoist is compact
Basic Information
Chinese name
Electric hoist
Foreign name
Electric Hoist
Overview: Main structure Installation and use Operating conditions wire hoist, product features Parameters and models Application range: explosion-proof hoist winch Multi-function hoisting weight is generally 0..25~80 tons, lifting height is 3~30 meters. It consists of electric motor, transmission mechanism and reel or sprocket. Wire rope electric hoist wire rope electric hoist is divided into single speed lifting and double speed lifting; miniature electric hoist, winch and multi-function hoist.
Reducer, hoisting motor, running motor, fire extinguisher, cable slide, reel device, hook device, coupling, cable current introducer, etc. integrate power and braking force.
Lifting weight: 0.25t-80t
Lifting height: 3m-30m
Working level: M3, M4
Running speed: 20 (30) m / min
Lifting speed: 8m/min
Electric hoists are generally installed on single beam cranes, bridge cranes, gantry cranes, and suspension cranes. A slight modification can also be used as a winch. Therefore, it is an indispensable machine for improving labor efficiency and improving working conditions.
Operating conditions: Ambient temperature: -20 °C ~ +40 °C Working system: Intermediate JC25% electric hoist structure reducer: Three-stage fixed-axis helical gear rotating mechanism, gear and gear shaft made of heat-treated alloy steel, cabinet The cover is made of high quality cast iron, and the assembly is tight and the seal is good. The reducer is a self-contained component and is very convenient to load and unload.
Control box: A device that can cut off the main circuit in an emergency and has a trip-stop protection for the fire-stopper. The safe operation of the electric hoist is ensured. Electrical components have long life and are reliable to use.
Conical motor: The hoisting motor uses a large starting torque conical rotor brake asynchronous motor without the need for an external brake. The motor load continuation rate is 25%, the motor is insulated with Class B or Class F, and the motor protection class is IP44/IP54.
The motor and the reel can be roughly divided into four types according to their mutual position. The pressed steel wire rope has large pulling force, beautiful and fast, and the crimping of a set of steel wire rope can be completed in only a few minutes, which greatly reduces the labor intensity and improves the work efficiency.
The electric hoist mounted on the outside of the reel has the advantages of good grouping, high degree of generalization, easy change of lifting height, and convenient inspection of the device.
Electric hoists are widely used, but there are fewer professionals who can operate electric hoists correctly. It is recommended that you learn more about electric hoists and make better use of various electric hoists in various fields.

Use maintenance
1. The electric hoist installed after the new installation or after the demolition inspection should first be air-tested several times. However, before the installation is completed, it is forbidden to turn on the power.
2. Before normal use, a static load test with a rated load of 125% and lifting from the ground for about 100 mm for 10 minutes should be carried out to check whether it is normal.
3. The dynamic load test is based on the rated load weight, repeated lifting and left and right movement test. After the test, check the mechanical transmission part, whether the electrical part and the connecting part are normal and reliable.
4. In use, it is absolutely forbidden to use in the unacceptable environment and in the case of exceeding the rated load and the rated number of closings per hour (120 times).
5. During installation, commissioning and maintenance, the positioner must be strictly checked for flexibility and reliability. When the hook is raised to the upper limit position, the distance from the hook casing to the drum casing must be greater than 50 mm (10t, 16t, 20t must be greater than 120mm). When the hook is lowered to the lower limit position, the wire rope safety ring on the reel should be ensured, and the effective safety ring must be more than 2 turns.
6. It is not allowed to simultaneously press two flashlight buttons that move the electric hoist in the opposite direction.
7. After the work is completed, the main gate of the power supply must be pulled off to cut off the power.
8. The electric hoist should be operated by a special person. The operator should fully grasp the safety operation rules and strictly prohibit the slanting crane.
9. In the course of use, the electric hoist must be inspected regularly by special personnel, and measures should be taken in time for faults and carefully recorded.
10. When adjusting the electric hoist brake slip, ensure that the brake slip amount S ≤ V / 100 under the rated load (V is the distance of stable lifting within the next minute of the load).
11. Scraping standards for steel wire ropes: The inspection and scrapping standards for steel wire ropes are carried out in accordance with CB/T5972-1986 "Practical Specification for Inspection and Disposal of Steel Wire Ropes for Lifting Machinery".
12. Electric hoist must maintain sufficient lubricating oil and keep the lubricating oil clean and should not contain impurities and dirt.
13. Hard wire brush or wooden small piece should be used when oiling the wire rope. It is strictly forbidden to directly apply oil to the working wire rope by hand.
14. When the electric hoist is not working, it is not allowed to hang heavy objects in the air to prevent permanent deformation of the parts.
15. If a fault is found during use, the main power should be cut off immediately.
16. Special attention should be paid to the wearing parts during use.
17.10~20 tons of hoist may have automatic power-off after continuous operation for a long time. This is the overheat protection function of the motor. At this time, it can be lowered. After a period of time, the motor can continue to work after it has cooled down.

Contact us if you need more details on Hoist with Electric Monorail Trolley. We are ready to answer your questions on packaging, logistics, certification or any other aspects about 1 Ton Electric Chain Hoist、Chain Hoist Electric Chain. If these products fail to match your need, please contact us and we would like to provide relevant information.

Product Categories : Electric Powered Hoists > Electric Chain Hoist